South Pars Gas Field Development - Phases 4 & 5

Phases 4 and 5 development was done in 2012; meanwhile, the old SSU was completely damaged and out of service. A new package was installed in order to maintain proper and reliable operation of the plant.


Sulfur / Sulphur Solidification & Forming (Granulation)
and Bulk Material Handling and Storage Unit
Capacity 720 tonnes per day
Method Sulfur / Sulphur Granulation
Client Ehsan J.V. (OD&CC, IGC, D&I)
Delivery Date 2011
Status Under Construction
Location Tehran - Iran
Feed Liquid sulphur from SRU plant
Product Granule (spherical shape) Sulfur / Sulphur
Number of Trains 2
Train Capacity 15 tonnes per hour / 360 tonnes per day
Storage 2 × 250 tonnes = 500 ton silo
Handling Rubber belt conveyor
Equipment
  • Granulator drum
  • Steam jacketed cyclone filter
  • Full steam jacketed exhaust fan
  • Liquid sulphur filter and pump group
  • Rubber belt conveyor
  • Bucket elevator
  • Process water tank & pump group
  • Pre-fabricated piping and jacketed piping
  • UCP/PLC control system
  • Instrument
  • Switchgear and VFD panel

Our Work Experience