South Pars Gas Field Development - Phases 4 & 5

Phases 4 and 5 development was done on 2012; meanwhile, old SSU was completely damaged and out of service. a new package is installed in order to maintail proper and reliable operation of the plant.


Sulfur / Sulphur Solidification & Forming (Granulation)
and Bulk Material Handling and Storage Unit
Capacity 500 tonnes per day
Method Sulfur / Sulphur Granulation
Client Neyr Perse/Mapna/SPGC
Delivery Date 2026
Status under construction
Location Assaluyeh - Iran
Feed Liquid sulphur from SRU
Product Granule (spherical shape) Sulfur / Sulphur
Number of trains 2
Train capacity 15 tonnes per hour / 360 tonnes per day
Storage 2 X 1,100 tonnes = 2,200 ton silo
Handling Rubber belt conveyor and bucket elevator
Equipment
  • Granulator drum
  • Steam jacketed cyclone filter
  • Full Steam Jacketed Exhaust fan
  • Liquid sulphur filter and pump group
  • Rubber belt conveyor
  • Bucket elevator
  • Process water tank & pump group
  • Pre-fabricated piping and jacketed piping
  • UCP/PLC control system
  • Instrument
  • Switchgear and VFD panel
  • Cabling and Bulk Material