South Pars Gas Field Development - Phases 17 & 18

The EPC contract for the development of phases 17 & 18 was awarded to a consortium of IDRO, OIEC and IOEC. OIEC and IDRO are responsible for the onshore section and IOEC for the offshore facilities including platforms and subsea pipelines. The offshore facilities are 100 kilometers away from Assaluyeh. Two production platforms with 22 gas wells form the core of the project. The project also includes two 32" pipelines for gas transfer and two 4" pipelines for MEG. The onshore refinery is located alongside phases 9 and 10 facilities and includes gas sweetening units, condensate stabilization, storage tanks, dehydration, refrigeration and separation units for ethane, propane and butane, gas de-mercaptanization and compression, sulfur recovery and granulation, and MEG regeneration units.


Sulfur / Sulphur Solidification & Forming (Pastillation)
and Bulk Material Handling and Storage Unit
Capacity 720 tonnes per day
Method Sulfur / Sulphur Granulation
Client Ehsan J.V. (OD&CC, IGC, D&I)
Delivery Date 2011
Status Completed and in operation
Location Tehran - Iran
Feed Liquid sulphur from SRU plant
Product Granule (spherical shape) Sulfur / Sulphur
Number of Trains 2
Train Capacity 15 tonnes per hour / 360 tonnes per day
Storage 2 × 250 tonnes = 500 ton silo
Handling Rubber belt conveyor
Equipment
  • Steel belt cooler
  • Pastillator machine
  • Exhaust fan
  • Liquid sulphur filter and pump group
  • Rubber belt conveyor
  • Bucket elevator
  • Sulphur drain tank and transfer pump
  • Storage silo
  • Telescopic chute
  • Cooling water pit & pump group
  • Liquid sulphur cooler package
  • Release agent applicator and vessel
  • Pre-fabricated piping and jacketed piping
  • UCP/PLC control system
  • Instrument
  • VFD and LCS